
Dholera Smart Infrastructure
Engineered from the ground up: Subterranean utility ducts, 4,400 MW clean solar power, the ABCD central command center, and multi-modal expressway corridors.
Access Corridor Reality
Ahmedabad to Dholera distance and expressway context
The Ahmedabad–Dholera Greenfield Expressway corridor extends approximately 109.019 km. It connects the Ahmedabad region with Dholera SIR and provides connectivity toward Dholera International Airport.
Verified Source: Ministry of Road Transport and Highways (MoRTH) & National Highways Authority of India (NHAI).
6 Core Infrastructure Pillars
Every plotted sector in Dholera SIR is served by certified subterranean civil assets.
Subterranean Smart Utility Ducts
All civic utilities—potable water, recycled water, 66 kV power cables, piped natural gas, storm drainage, and multi-core fiber—run through concrete underground trenches. Road digging is permanently eliminated.
Tata Semiconductor Fab & Anchor Park
Tata Electronics and Taiwan's PSMC anchor India's flagship 28nm & 40nm chip fabrication facility inside the Activation Area, supported by dedicated high-voltage uninterrupted power and industrial gas lines.
4,400 MW Dholera Solar Park
Massive coastal solar generation facility providing 100% renewable power blending to industrial operations, connected to Gujarat Energy Transmission Corporation (GETCO) 765 kV pooling stations.
ABCD Command & Operations Center
Administrative and Business Center for Dholera (ABCD). Hosts city-wide SCADA monitoring, automated flood sensor telemetry, intelligent traffic control, and unified municipal governance under one roof.
Zero Liquid Discharge (ZLD) Water Grid
Closed-loop water conservation with 100 MLD water treatment, 10 MLD sewage treatment plant, and dual-piping supplying tertiary-treated water for industrial cooling and landscape irrigation.
Multi-Modal Arterial Road Network
Heavy-load concrete pavements engineered to transport super-dimensional industrial cargo directly between the NH-751 Expressway, Dholera Airport, and Dholera Port corridors.
Ground Infrastructure Benchmarks
₹3,000 cr+
Trunk Infra Spent
Click to inspect official DSIRDA allocation gazettes →
22.5 km²
Operational Activation Area
Browse verified commercial plots inside TP2A →
55m - 250m
Arterial Roads
Check ROW alignment on high-res TP maps →
100%
Clear Title Verification
Run due diligence check on target survey number →